Infrastructure and Equipment

Banner Image

Infrastructure & Equipment

We have more than 736.5 thousand m2 of infrastructure nationwide and we provide our customers with a modern fleet of equipment operated by reliable and highly trained personnel, which guarantee the efficiency and quality of our operations.

  • 650-meter straight-line quay with 16 draft
  • Seven (7) Super Post Panamax quay cranes able to handle vessels of 300 meters LOA
  • 21.5-hectare for operations
  • Twenty-one (21) yard cranes (RTGs)
  • 448 fixed connections for reefers
  • Gate complex with 8 entry lanes and 4 exit lanes, equipped with scales and OCR systems for truck recognition.
  • Area for cargo inspection.
  • Equipment to handle containers and information technology systems for traceability of operations

In addition, we have a Temporary Customs license in order to offer our clients efficiency for the clearance of cargo at arrival directly from the terminal pursuant to customs procedures as approved by Customs (SUNAT).

Callao

Ans: Head Office

Av. Argentina 2085 – Callao

Area: 170,000 m2

Ans: Carretera a Ventanilla Av. Nestor Gambetta Km. 14 S/N Callao

Area: 110,000 m2

Ans: Carretera a Ventanilla Av. Nestor Gambetta Km. 14 S/N Callao

Área: 60,000 m2

Ans: Carretera a Ventanilla Av. Nestor

Gambetta Km. 15.7 S/N Callao

Area: 210,000 m2

Paita

Ans: Zona Industrial II Mz F Lt 1 Parte alta de Paita A 2.5 Kms del TPE

Area: 80,000 m2

Ans: Zona Industrial II Mz F Lt. 1

Parte alta de Paita

A 2.5 Kms del TPE

Area: 200,000 m2

Lurín

Ans: Lote 2, Sector Quebrada del Lúcumo – Lima

Area: 54,000 m2