New Pre-Gate
Home | DP World Luanda| Multipurpose Port and Terminal
News
New Pre-Gate
New Pre-Gate
Previous Situation
The room responsible for pre-gate operations was in disrepair. There were leaks throughout the room and structural problems that made it impossible to carry out the work.
Share